
Press Boxes for Grandstands and Bleachers
Enclosed press boxes, coaches’ and camera decks, flag stands and timing towers, built on the stand with power, data and the access route planned from the first drawing.
Planned with the stand, not bolted on later
A press box is a small building twenty feet in the air, and it is usually the most expensive single option on a grandstand. Planned early, it is a straightforward structure on the back of the stand. Planned late, it is a change order with its own foundation.
We design the press box with the grandstand it sits on: the structure under it, the stair or ramp that reaches it, the power and data that run to it and the camera deck on its roof. One drawing set, one engineer of record, one crew.
- Enclosed press boxes on elevated and stadium grandstands
- Coaches’ booths, media seats and camera decks
- Small press boxes and crow’s nests on I-beam bleachers
- Flag stands, timing and scoring towers and VIP suites at race tracks
- Announcer and judge stands at fairground and rodeo arenas

How big should it be?
Start with the people, not the square footage. Give each person about 30 inches of counter and the width of the box follows.
| Typical use | Width | Depth | Who is in it |
|---|---|---|---|
| Small school or park | 16 to 20 ft | 8 ft | Announcer, clock, two coaching positions |
| High school stadium | 24 to 32 ft | 8 to 10 ft | Adds media seats, separate coaching rooms and a roof camera deck |
| College or large venue | 40 ft and up | 10 to 12 ft | Multiple booths, broadcast and stats; often two levels |
| Race track | 24 to 40 ft | 10 to 12 ft | Race control, timing and scoring, flag stand and suites |
Where it sits
Centered on the 50-yard line or the start-finish line at the back of the stand, with its floor at or just above the top row so it does not block the seats behind it. The roof is usually the camera deck.
What runs to it
Dedicated power for the PA, scoreboard controls, broadcast and HVAC; fiber or Ethernet to the box and the camera deck; lightning protection and grounding. Sleeved under the stand before the footings are poured.
Who can get to it
The 2010 ADA Standards have a specific exception for smaller press boxes. Go past it and the box needs an accessible route, usually a platform lift or an elevator, which changes the structure and the budget.
Press boxes by series
| Series | What goes on top |
|---|---|
| GB-I I-Beam | Small press box or crow’s nest |
| GB-E Elevated Grandstand | Press box, camera deck, lighting and PA mounts, roof or canopy |
| GB-S Stadium Grandstand | Press level, broadcast positions and suites |
| GB-R Raceway | Flag stand, timing and scoring, media and VIP towers, camera decks |
Press box questions
How much does a press box add to a grandstand?
It is usually the most expensive single option on the stand. Size, how it is reached and what runs to it drive the number. Planning it with the stand keeps it a straightforward structure instead of a change order with its own foundation.
Does a press box have to be accessible?
Not always. Under the 2010 ADA Standards, an accessible route is not required to a press box in bleacher seating with entry at only one level, or one that is free-standing and elevated 12 feet or more, as long as all press boxes at the venue total 500 square feet or less. Larger boxes need an accessible route.
Can you replace or add a press box on an existing stand?
Yes. We replace press boxes and add them to existing stands. We check the frame and foundations first, because the stand has to carry the box.
Can we budget the press box for a later year?
Yes. Have the stand engineered for it now: leaving the connections, the rear platform and the conduit ready costs very little, while adding them to a finished stand costs a lot.
What should run to the press box?
Power and data at minimum: dedicated circuits for the PA, scoreboard controls, broadcast equipment and HVAC, and fiber or Ethernet to the box and the camera deck.
Can you put a modular or prefab press box on our stand?
Often. A factory-built box is a building; the deck it sits on, the stairs and guards that reach it and the connections all have to be engineered for its weight and the wind on it. Tell us early and we will draw the stand to carry it.
Does a press box have to be accessible?
The 2010 ADA Standards have a specific exception for smaller press boxes. Past it, the box needs an accessible route, usually a platform lift or an elevator. See press box design and planning.
Planning guides
- Planning a press box
Size, access, power and data, the ADA press-box exception, and what else belongs on top of the stand.
- Bleacher or grandstand?
Where the line falls, and what each costs you in footprint and foundations.
- Permits, inspections and the engineer of record
Who stamps what, and how the permit package goes together.
Planning a press box?
Tell us who will be in it and the stand it sits on. We will come back with a layout and a number.